Well, six months after we first broke ground our new rental space is now complete. Just a few more details to take care of but we will be putting the studio out to rent any day now. Between the pace of construction in Mexico, Christmas holiday delays, a sick contractor, visiting friends, lack of motivation and an injured wife the project took a couple months longer than we hoped but we really really like it! We hope you all do as well. Here are some photos!
Our family blog following the events leading up to and during our efforts to live in our ever changing pueblo of Sayulita, Mexico.
Wednesday, April 13, 2022
Sunday, November 14, 2021
A New Casa - Casa PŌNO Sayulita - November 2021 Update
What? Another update? Isn't the house done yet? What could possibly be happening now? I think we kind of feel the same way but this will hopefully be a short project with a look to the future. We have been renting the PŌNO Suite, our one bedroom apartment, for mostly long term stays since COVID turned the world upside down. There are certainly pros and cons for that kind of occupancy arrangement. There is always someone living in your house to consider when doing anything disruptive, we cannot use that space to accommodate friends and family and the overall monthly income is probably a good bit lower than if we rented it nightly. Fortunately we have liked our long term renters and have undoubtedly enjoyed any extra income it generates. Plus, there are fewer hassles with check-ins, check outs etc. That rental income pretty much goes right back into the kid's monthly school tuition. Such a benefit to help cover those expenses!
| The backhoe arrives to dig out all the extra soil that filled the lower 2 tiers. |
But could we do better renting using what we already have? Well, we knew we wanted to reduce Ashley's flying time but how are we supposed to do that when college is looming in the very near future? What could we do now that would help? I began scheming and coming up with ideas. In our family, I am the one who comes up with a plan(aka a "scheme"), Ashley poo poos it for a time and then she eventually sees the light and provides the capital for the project. Then it is my job to get it done. To be honest, it is sometimes her scheme and then again, it is my job to get it done. I have to say it has worked for us pretty well to this point.
The front yard of our property provided an opportunity for and additional rental unit. The original plan for the yard space was for a grey water treatment system. That whole idea got scrapped during construction and it had become a kind of 3 tiered minimalist garden space. What I could see was that the middle tier was about the size of a hotel room. The walls were already in place and tall to allow for a high ceiling. The lower tier could accommodate a small outdoor seating area and we could steal some space from the existing bodega in the upper tier for a bathroom. Genius!! Well, Ashley didn't quite think so at first but after a few months, some number crunching and the scary reality of college tuition looming she came around to the idea and said "let's do it"! Get it done!
| My official napkin drawing the contractor is working from. |
The vision was a large room with kitchenette, closet, king size bed, decent size bathroom and a private outdoor seating area. One side of the room would be all windows and there would be a skylight providing some additional light to the space. All the utilities were right there and the bathroom location provided easy access to the sewer line that ran from the house. The space resembled our master bedroom so it was easy to measure up and walk the contractor, Antonio, through the plan. Antonio was also the foreman on the original house construction and has been our "go to" guy for everything the last several years. He knows pretty much every part of this house so there would be few surprises.
![]() |
| The front yard with most of the extra fill and debris removed. |
We also saw an opportunity for additional water storage. Water will continue to be an ongoing issue in Sayulita since the town has yet to grasp the relationship between the amount of construction, visitation and resources available. So, buried under the adjoining patio we would be adding a 5000 liter plastic cistern. This would help to bridge the every increasing times without water pumped to the homes in town. No water days are usually due to water department pump problems, line repairs or lack of supply in the late spring and early summer. Sometimes the only way our neighbors get water is to get 10,000 liter water trucks to deliver water every week or so. Water trucks are a booming business here. This cistern addition would bring our on property water storage capacity to over 12,000 liters. A smart and easy add-on with a machine on site and space big enough to hide it.
| The cistern pit partially covered by planking. |
After about 3 weeks of demolition, debris removal etc the crew formed up the roof and a pump truck was hired to make the job quick. I must admit that sometimes it's frustrating when local construction blocks the narrow streets in town but it is super AWESOME when it's our construction!! With the roof poured in less than hour it was on to cleaning up extra debris to make way for a final level for the floor and some roughing of electrical in the walls.
| Pump truck making quick work of the roof. |
| Additional debris gone, bed base and door to new bathroom at the back. |
| Inside looking out. |
Friday, July 17, 2020
A New Casa - Casa PŌNO Sayulita - July Update 2020
Earlier in the summer we completed the rooftop shade structure. Though still really hot it allows us to enjoy the summer breezes and the view from the top of Sayulita. Some of the projects we pushed to get done are small and just convenience things and others required a lot of thought and planning to get right.
For a couple things we enlisted the help of the former foreman who was the on site supervisor when the house was built, Antonio. A super nice guy and has always come through for us. He was the perfect guy to get back to the house to help us complete some things and repair some items that were causing problems for us. He knew how the house was put together and it was good to see him again.
| Bypassing the roof drain. |
| Redirecting water to front of house. |
| Better than just dirt. |
The big project that took place recently was installing a deck in what we call the "garden" or the clear story area in the house that allows light and airflow.. Really nothing more than a dirt patch in our living room it sat neglected pretty much since construction. It never had a floor since it, at one time, was exposed to the summer rain, debris and iguana shit. We had the polycarbonate roof installed but we never really had the reason to do the deck project until Ashley got sick of looking it. I stopped really "seeing" it a long time ago so I was indifferent and was more concerned about cost.
![]() |
| Our dirt patch in the living room. |
![]() |
| Wood "sleepers" attached along side of the metal joists. |
![]() |
| The super cool Kreg Deck Jig. |
![]() |
| Ashley's books will find a permanent home eventually. |
Sunday, May 31, 2020
A New Casa - Casa PŌNO Sayulita - Early Summer Update 2020
So, we decided to do something about it now that it appears being home is most certainly going to be the recommended routine for the months to come. We would delay any other plans for finishing other punch list items for the time being and we have always wanted to finish the rooftop. The view is hard to beat and a big reason we bought the lot back in 2007. We considered buying a bunch of plants but the transporting that amount of soil, mature plants and large pots just sounded like a lot of work. We considered rigging up some shade sails but we really didn't have good anchoring potential to keep the sails in place during the summer storms and high enough to be able to walk under them. We even threw an old area rug down to keep the heat off the roof above the master bedroom. None of the solutions really worked very well so we decided to get a proposal from our metal contractor who previously installed the metal/polycarbonate roof.
The goal was to provide shade for a seating area similar to our living room, a dining table area with chairs and the wet bar area which was already covered but was unfinished. About 30-40% of the rooftop would be left uncovered so anyone looking to sit in the sun someday could do that. We would also choose a polycarbonate that has a tint to it to help with the shade effort where we had chosen clear for areas allowing light into the house. We would also be able to use the area during the summer rains and stay mostly dry.
Some before and after photos.

Sunday, February 23, 2020
A New Casa - Casa Pono Sayulita - Mid Winter Update 2020
Though several ideas were considered we decided to make this area an interior deck space. When the jungle rains get in the materials would be able to handle getting wet plus the wood deck would break up the mostly concrete and metal finishes we currently have in the house. It would soften the look of the living area as well as create a bit of separate space within the space to do fun things with at some point.
The other thing we had done was have a hand rail installed on the stairs in the same space. Too many visitors got freaked out and we always had fears of someone walking off the upper landing in the dark not realizing that there was a 3 meter drop. So, we had a partial handrail installed as well. Enough for safety but still allowing for Ashley's plant shelf to remain as is or be added to in the future.
The finish decking will be done in a tropical hardwood called "Cumaru". Insect resistant and a good choice for this climate. Because the deck is protected from sun and water we hope we will rarely have to maintain it. Installation of the actual decking is coming but the metal work was a big step in the right direction.
We had a new house sign made as well with a CNC plasma cutter. Pretty cool!
Sunday, April 7, 2019
More Tear Downs - Sayulita Centro Will Never Look The Same
![]() |
| Standing in front of Mary's looking toward ocean. This was the Ejido building. |
![]() |
| Standing in front of la Morada |
![]() |
| Standing in from of Hotel Kapuri. Looking at former Casa de Cultura location |
![]() |
| Standing in front of Hotel Kapuri looking back at the remnants of the Ejido Building. |
![]() |
| Former location of the Casa de Cultura |
Monday, March 25, 2019
Million Dollar Tear Downs Have Begun!
![]() |
| Computer rendering. |
Thursday, March 7, 2019
Sewer Treatment Plant Improvements Update - March 2019
*Written by: Aanya Sheikh-TaheriAs many of you have noticed, professional workers and engineers have begun the construction and placement of the new emissor at the river bed which connects to the main beach. This is part of an ongoing project from Sayulita’s new Sewage Treatment Plant. I talked with key members from the board of Grupo Pro Sayulita, who began this project several years ago and remain the liasons with the government officials now in charge of the plant and project. All of the projects have been designed to upgrade previous wastewater management systems. Phase 1 began more than two years ago, and phase 3, being done now, will be completed in the next few weeks.When and why did this project first begin?Until about two years ago, Sayulita suffered from occasional spills of grey and black water in Gaviotas street, where it connects with Calle Navarrete. These problems occurred during the rainy season, when rain water overwhelmed the old system in place. Grupo Pro Sayulita partnered with other government associations of Sayulita and Bahía de Banderas to understand this problem and solve it. Old and insufficient pumping was found, and it was discovered that the holding tank in the wastewater plant, known as a carcamo, was too small for our growing town. The upgrade to our current treatment plant doubled the capacity of the holding tank.What was phase 1 of this project? What are the other phases?Over two years ago, Grupo Pro Sayulita partnered with Oromapas, CEA and CONAGUA. Grupo Pro created an infrastructure committee and funds that worked with these government agencies and local and international engineers in order to authorize the needed work and fund it. At that time, CEA and CONAGUA agreed to provide the necessary permits, and Grupo agreed to fund phase 1, now known as the “Gaviotas Project”. Also, at this same time, Conagua and CEA agreed to create phase 2 and fund it. Phase 2 included the repair and upgrade of the waste management plant itself. These organizations also agreed to plan and fund phase 3, the underwater emissor. Over the last year, phase 2 was completed; now phase 3, the emissor, will be complete in the next several weeks.How does an underwater emissor work?Emissors are the most common form of wastewater management systems in the world, and are used all over Latin America, the US, and Canada. The emissor was designed by completing a wave and ocean study to ensure that the pipe does not disturb the reef, and to ensure it is located in a place that is safe for both ocean life and humans. Our emissor will send treated water 2.3 km from the coast; it will be attached to the ocean floor and sit about 60m down from the surface. The treated water released can then be further broken down by natural ocean chemicals and effectively become food for ocean animals. This system will allow us to not put treated water into the river bed, and will allow the natural estuary of the river mouth to return. This is the work being completed now.What would you say to skeptics, or those who think this project will not work or is even more harmful to the environment?There are many who do not understand this project and who do not understand just how common it is throughout the world. The reason it is so commonly used is that it is not a complicated system, and it works. For two years, we met with teams of wastewater engineers from all over the world, and every single one of them landed on this solution. In this consultation process, environmental protection was the first goal. The water will be treated from the treatment plant and discharged more than 2km from the coast, where it will be mixed with seawater without any negative consequences for marine flora and fauna. There are also those who are worried that the emissor will change the path of the waves; this is simply not going to happen because it is a pipe of just over 20cm in diameter, which will be fastened with concrete bases every four meters, and will be semi-buried, so as to not alter the ecosystem.When do you anticipate the project to be completed?The treatment plant is ready to go and is waiting to be connected to the emissor. The emissor is scheduled to be completed in the next several weeks, however that does depend on the conditions of the ocean. We will be working with Conagua to publicly announce the completion of the emissor when finalized.
![]() |
| Emissor pipe staging in the river. |
![]() |
| Photo by Sayulita Life |
![]() |
| Trench digging at the river mouth during low tide. |
![]() |
| Photo by Sayulita Life |